ItemWhoNotes
Brakes

Adam

  • No update, pedal mounting
ChassisAdam
  • Sent out to review, VR3
  • Ready to resend, awaiting payment to be sorted out
  • Sims past well, chassis is quite light
  • Pushing to get tabs finished out
  • Jig is underway, hopefully construction done by end of Sep
DoorsDevon
  • Considerable progress, not done yet
  • Part of the second VR3 order
Driver ControlsAdam
  • Accelerator pedal does not hit the floor of the chassis
  • Parts have been ordered in, parts are also on the shelf
  • Large rack for asymmetric steering, linkages shift steering column
  • Sleeve yields at point on the steering collar, and stops on a collar (4"-5")
  • Tie rods will be a challenge, (Chassis interference on compression of suspension)
SuspensionAdam
  • Remained stagnant, changes made to the structure of the control arms
  • Use plates to seat the bearings
AerobodyAdrian
  • Shape defined. refined
  • Shape is bumpy
  • Optimizing for aesthetic and array optimization
  • Alias is used as a surfacing program (typical in automotive design)
  • Preliminary panelization was done, however the unrefined model caused issue
Battery BoxAdam
  • Tested battery packs
  • Pulled the right voltage and current, no issues
  • did not use typical manufacturing methods though
  • vibe testing was not done, an unresponsive professor does have a vibe test

Action items

Aerobody 2/3 people (Adrian) (SL + DV) + 2 months

  •  Refinied surfaces
  •  Key Blends
  •  Overlaps, flanges
  •  Fasteners
  •  Molds
  •  Hinge Pivot Points
  •  Weight reduction on Aluminum Parts
  •  Windows Windsheild
  •  Stiffening in rear panelling

Battery Box (Adam)

  •  Module CAD has to be finished (Bus Bars) (SP)
  •  Reliability for removability and connectivity
  •  Box Interals
  •  Routing Plan (mind radii)
  •  lower inside rail only has one mounting point
  •  Weight reduction on Battery Box Mount (MS)
  •  Vibe testing
  •  Charger Rounting CAD
  •  Dimple JIG CNC work

Chassis (Matt)

  •  Send out Tabs (missing old style bear claw tabs)
  •  Send out Tubes
  •  Prepare Jig (SP)

Doors (Devon)

  •  Finish bracket for the handle (Subject to change based off of aerobody)
  •  Model internal handle
  •  model foam, and mounting for aerobody panels
  •  analysis on door to ensure yielding on 5g

Steering (Devon)

  •  tie rods
  •  Collapse Sleeve (Sleeve + flanges)
  •  Heim Joint (rod ends)
  •  Wheel + elec + Interface
  •  clock spring + wiring
  •  bearing speced
  •  thrust bearing/bushing for collapse sleeve
  •  Tabs


Brakes (Matt)

  •  Purchase remaining parts
  •  Rotors can be used, but shims may need to be used in brakes (wilwood said current setup is fine)
  •  Scrub bobbin CAD (BM)
  •  Drawings
  •  Design return Spring for the brake pedal
  •  Put encoder on the brake pedal (BM)
  •  E-brake handle and caliper mount

Suspension (Adam)

  •  Steering arms (RS)
  •  parking brake mount (RP)
  •  low conrtol arm
  •  redo analysis
  •  weight reduction
  •  Bump Stops
  •  specced bushings
  •  wheel interface needs to be revisited

Miscellaneous

  •  Fasteners
  •  Part numbers
  •  PJB
  •  Other Box Mounts
  •  Update Drawing Template (Devon)
  •  Mock Chassis (Matt & Adam)(Sun)