Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Dura-clik crimp tool, crimps, ISL retainers, receptacles etc etc

Follow-up  

Array

  • Slightly behind schedule, but we should still have our preliminary layout done by the end of August

Battery

  • Behind schedule, cells have arrived, but we still need parts from mechanical to prototype

BMS

  • Hardware
    • Rev 1 is working, but we need to re-spin for some minor changes
  • Software
    • ADC driver is mostly done, the actual application code is fairly straight forward other than SOC, and it can be done next term

Power Distribution 

  • Hardware
    • Rev 1 was mostly functional, Rev 2 has been ordered and planned to be populated by the end of Aug
  • Software
    • Software should also be mostly done by the end of August

Driver Controls

  • Hardware
    • Rev 1 of Driver Controls Carrier and Peripheral were sent out, and should be tested by the end of the term
  • Software
    • Good progress has been made. Some changes have to be done, but should be good for testing. 

SWD Adapter

  • Hardware is finished and fully functional

DCDC (TBD)

  • Still scheduled to be done by Fall 2017

Aux BMS

  • Behind schedule, but should be done by end of Fall 2017

Motor Interface Board

  • Hardware
    • Hardware should be complete by the end of the term
  • Software
    • TBD, but it should be done by Nov 2017

Lights

  • Hardware
    • Lights have been mostly chosen, should be done by end of Fall 2017
  • Software
    • Done by end of next term

Telemetry

  • Hardware
    • Eval boards for now
  • Software
    • Jan 2018 is still a good deadline

Solar Interface

  • Hardware
    • We need 2 solar masters, and each will control maybe 2 relays