...
3M structural adhesive left underneath the cabinet (we have 6, we need 2)
The mix ratio is 2:1 and provides 20 minutes of work-life, allowing time to adjust for the desired fit prior to curing. This adhesive reaches handling strength in approximately two hours and is fully cured in 24 hours at 72 °F (22 °C).
Make sure the gun matches, push and pull the tabs
Use quadro static mix nozzle (we have 5, we need 2)
It is recommended to use a new tip or mixer nozzle for each cartridge
MAKE SURE TO TILT UPWARDS AND TRY TO GLUE
very viscious
Gasket:
cut to-size
not a priority
...
have a partial 3D printed baffle with length 15mm instead of 5mm to make sure holes align at the right spots for baffle
assemble all 4 side panels first so you can clamp from the bottom BEFORE gluing in the bottom piece and weighing it down with books/something heavy
flip the enclosure upside-down when gluing the side lid panels so gravity can due its work. Q: how to make sure this lines up correctly?
If it takes 24 hours to set the panels - you would have to wait between each step (length, width, etc.)
NEED TO FIND OUT WHERE TO ORIENT CLAMPS - stability
make sure enclosure feet fit to Chassis, test screwing-in bat box to enclosure
Resources:
Epoxy Datasheet: https://dm.henkel-dam.com/is/content/henkel/LePage-Speed-Set-Professional-Epoxy-TDS