12/02/2923

TO-DO: finalize lights wiring (gauges + lengths)

22 AWG for all LV systems!!!!

  • could also use 18 if 22 is too sus…

  • crimps for 22 AWG available!

to-do: make calculator for wire length, current in - power loss out

make table for harnessing wire lengths

3 solar relays

to begin wiring things beginning of next term

DEADLINE: beginning of next term

Short term items:

  • clean up mockup spreadsheet

  • do battery box enclosures

  • solar harnessing ideas

PD Outputs

11/25/2023

All possible board mounting locations

...

  • Lights

    • 6 turn signal lights (yel”owyellow)

    • 3 in parallel (for either side)

    • 3 brake lights (red)

    • all in parallel

    • 2 headlights(white)

    • parallel

    • 1 bps fault ubducator (white)

    LOCKED ELECTRICAL SYSTEM CENTRAL LOCATION

  • table for mockup!

...

  • can’t be over battery box because they remove from the top

  • can’t be on side flange since it’s difficult to get to - Michael

  • figure out area size needed, then reach out to Michael Hanley to figure out proper area for PD

...

Image Modified

...

Image Added

Battery Enclosure Circuits

...