titleJan 3, 2023 Module Manufacturing

Pre-Meeting Notes:

  • What is the current state of modules?

    • 9 modules manufactured

      • QA: doing series spotwelds first decreases resistancehot glue thermistors to busbar (only top and bottom as they get hottest)

        • modules were redone to do parallel spotwelds first

    • About thermals

      • Epoxy will increase rigidity of module and won’t have effect on heat transfer as cells are covered on top and bottom anyways

      • About Thermistors

        • Thermistors should be attached with hot glue instead of kapton tape

        • each module can have 3 thermistors

        (
        • , put them on top

        ,
        • of module so it is easier to

        manufacture)
        • make?

        • busbars are good conductors, MS14 had thermistors only on busbars. Busbars are better for catching any cell that heats up

        • we should put 1 on each busbar and 1 on center cell on negative end (closer to jelly roll)

    • About Voltage taps

      • NOTE there will be a difference b/w sum of voltage taps and pack voltage (through multimeter) because of Vdrop from busbars Vtap position

      • Donna asked about Vtap positions on bottom of module, Micah says they are ok (placement is closer to some cells, but prob only ~1mv diff)voltage drop may occur between voltage taps (resistance of busbar)dif

    • 1 tested w/ forest

      • quick test access to HV room w/ big eload (chroma?)(not following testing plan)

      • future tests to use HV testing room’s Chroma

  • What do we need to do W24?

    • 9 modules + 5 spare modules manufactured and tested/validatedTest 8 modules

    • 3 aux batteries

      • Testing: basic capacity test (full cycle + IR)

  • Review Module Testing Plan with Micah

    • About IR Test

      • All modules should be at same SOC when testing IR

      • cannot use multimeter because

      of method
      • multimeters measure resistance by sending current through the resistance (doesn’t work for battery)

    • About Balance Test

      • wouldn’t do balance test

    • About Full Discharge Test

      do
      • High current testing is most important

    • when making tests, what can we do if it doesn’t pass?

    • wouldn’t do balance test

      • Do full discharge for max current test

      • when checking temperature, use temperature rise from ambient rather than absolute temperature

      first
    • Extra test: look at voltage of each individual cell

    • When making tests, what can we do if it doesn’t pass?

    • Pack testing

      • First pack test should be as controlled as possible (chroma e-load)

    • Extra test: look at voltage of each individual cell

    • Ideal pack testing
      • take bench outside with pack and array, discharge and watch array charge the pack

      • OR put the whole system together, see vehicle move, watch array charge

    Review Modules with Micah

    • Does he have any concerns with any choices we made?