  1. Bring enclosure frame and panels to the machine shop

  2. Grab epoxy from ??? - have to confirm whether we are buying our own stuff, Shem ordered or Michael already has some somewhere 3M structural epoxy from underneath chemical cabinet

  3. Clamping bottom panel: put something heavy (with one object towards the middle that does NOT move) to keep it more steady

  4. Clamping width pieces: should be straight forward because there are holes in the fibre-glass due to vent + fan holders

  5. Clamping length pieces: ~3.5cm from the top of the steel frame to the top of the fibre-glass. Grab the metal clamps from the drawer in the bay and clamp the top. To ensure the bottom is flush grab something heavy and place along the bottom and sides

  6. Wait for epoxy to dry

...