2023/11/18 Leads Meeting

Agenda Items:

  • ASC 2024 update

    • all our preliminary documents have been submitted!🎉

      • next deadline for Vehicle Design Review (VDR) is January 31, 2024

  • W24 Co-op hirings

    • opens November 27

    • 1 mech, 1 fw co-op

    • need new mech co-op supervisor…

      • Jasmine or Matt…

    • fw also needs fw supervisor

      • tbd

  • Michael can no longer be Bay safety captain

    • can’t be a mech lead

  • Fatima taking over operations (business meetings)

    • marketing lead needed!

Sub-team Progress Check

Mech Gen

  • HARD DEADLINE: December 7th - everything needs to be mounted to chassis for power-coating

Aero

  • roof mold?

    • good progress, almost done

    • hopefully complete by end of friday

    • good attendance at sanding sessions (HUMMUS)

  • aero ribs got cut

    • starting aero-chassis integrations

  • wheel cover molds in progress

    • goal: make at least 1/4 by end of term

Chassis/Interiors

  • printing jigs for additional roll cage tubes

  • goal: next weekend to weld up

  • interiors:

    • longer meetings for remaining term

    • goal: 95% interiors design complete

Dynamics

  • carmelli found new sponsor

    • 5 new parts to machine

    • suspension sponsored for manufacturing

  • brake sims are doing well

  • jens working on steering

    • steering should be done by November 24th

Battery

  • module manufacturing

    • 1 complete, many to be spotwelded

    • goal: december 8th completion

  • enclosure:

    • waiting on last metal piece

    • jigging complete

      • finish machining metal

      • 2/4 more parts to be machined

    • 3d printing parts in progress

Firmware/Hardware

  • great progress

  • steering fully assembled

    • solving hw issues

  • center console blocked by 2 segments on display not working

    • once solved, will be first fully validated board!

  • PD close to complete, needs some changes

  • can integrate steering, center console, and PD in elec mockup

    • need physical support for mockup…

  • #elec-mockup

  • fw working on MCI, AFEs

Strategy

  • not too many updates

  • script to check internet connection to grab data

  • solar demo for Forest, Kostubh

    • modified since then

    • model is single panel

  • ETA, elevation microservices in progress

    • elevation blocked by optimization model

  • waiting for race route!

Business

  • Michael is stepping down to focus on aero

  • Fatima is running business check-ins

  • Rivian Info Session Monday, November 27 at 5 PM in Rm 2004

    • general overview of Rivian, followed by a panel/Q&A with Rivian Engineers

    • invitation is for Midnight Sun and Formula Electric

  • Neuralink event TBD

Marketing

  • OPEN POSITION!

Sponsorship/SI

  • WEEF full funding granted!

    • $7K

  • to-do: Department Funding set up

    • get monetary funding from MME and ECE for ASC fees

Finance

  • YANSHEN: to reach out to Peter about opening up Concur reimbursement platform

    • all mech purchases have been going through Michael

      • through concur, Sarah, personal funds…

      • most purchases go through sarah

...

2023/11/11 Leads Meeting

Agenda Items:

  • Meeting w/ Peter + graeme

    • Thursday, November 9th

    • leads critical to vehicle completion REQUIRED!

      • mech leads

      • mitch (fw)

      • forest

      • jonathan

      • + tech leads for next term

    • to discuss feasibility of vehicle completion

    • pre-meeting check in Wednesday?

      • 7 PM

  • PVDR Deadline Monday!

  • Potluck Friday!

  • HUMUS

Sub-team Progress Check

Mech Gen

Aero

  • gluing canopy mold pieces together today - starting the sand

    • Deadline: Nov. 20th

  • aero bottom half repairs done

    • E3 will work on it

  • Machining windshield mold early December

    • MDF to get picked up in Caledon

Chassis/Interiors

  • ASC collision sims (roll-cage) problem

    • need to re-run sims

      • sims complete!! W

    • got Ansys license again

    • need to add more roll-cage tubes

      • goal: get reinforcements before peter meeting

  • interiors:

    • roof-tilting general idea figured out

      • partially approved by ASC

      • testing needed

    • mo 3-week december grind

    • design review for today, MVPs next week

Dynamics

  • Matt and Mack reviewing drawings before FSU part sendout

  • brake caliper mounts and sims progress

    • good progress, passing sooon

  • RSU bearing housings sent out (thanks winters)

    • next sendout coming up (blocked by brakes design changes)

  • Jens working on steering

  • looking for 1 more sponsor

Battery

  • Module:

    • 1 complete

    • 14 by the end of term

    • 9 required for pack (12-14 accounting for spares)

  • Enclosure:

    • shem finished drawings, ready for review

    • blocked by metal from E3 not arriving

      • arrived by missing 1 poiece

      • manufacturing happening rn!

  • slightly behind schedule

  • aux:

    • focus on main battery pack for now

    • design review TBD

Firmware/Hardware

  • MCI assembled

  • PD rev 1 fully hw validated

    • sitll need to validate rev 2 but it’s very similar

  • PD rev 2 (major change) layout in progress

  • centre console close to fully hw validated

    • it’s working!! lots of stuff working know because of it

  • controller board sendout made (waiting for parts)

  • fw not blocked

  • Centre console fully validated next week

  • centre console on track to be first one fw validated

  • PD rev 1 can be fully fw validated

Strategy

  • have all data + infrastructure needed for solar irradiance

  • meeting w forest happened

    • figuring out optimal speed based on data received

    • might need more SoC data

  • route optimization systems set up (pre-race)

Business

  • michael stepping away from business

    • projects:

      • insta reels

      • fundraising

      • merch store

      • internal book

      • internal funding wrapped up (for this cycle)

Marketing

  • sponsor sundays

Sponsorship/SI

  • internal funding apps done

  • reaching out to sponsors and old sponsors

Finance

...

2023/11/04 Leads Meeting

Agenda Items:

  • Meeting w/ Peter + graeme

    • Thursday, November 9th

    • leads critical to vehicle completion REQUIRED!

      • mech leads

      • mitch (fw)

      • forest

      • jonathan

      • + tech leads for next term

    • to discuss feasibility of vehicle completion

    • pre-meeting check in Wednesday?

      • 7 PM

  • PVDR Deadline Monday!

Sub-team Progress Check

Mech Gen

Aero

  • gluing roof mold pieces together today

    • Deadline: Nov. 20th

    • may need to revamp HUMMUS…

  • aero bottom half repairs done

    • to start top-half repairs

  • Machining windshield mold early December

    • MDF to get picked up in Caledon

...

  • internal funding apps done

Finance

...

2023/10/28 Leads Meeting

Agenda Items:

  • ASC 2024 Pre-Event Team Status

  • WEEF Applications due October 31st

Sub-team Progress Check

Mech Gen

Aero

  • Roof + Canopy Progress:

    • lots of issues 😞

      • machine shop delays, mistakes, etc.

    • building mold this week (goal end of weekend)

      • trying to meet end of Nov deadline

  • Windshield mold:

    • getting made next week

    • thermoforming (sponsored!) by supplier

  • wheelcovers/wheel well transitioning into next term

...

  • get F23 EngSoc wishlist by END OF TODAY

  • F23 second-half milestones + initiatives

    • i.e. manufacturing goals, resume reviews, etc.

Sub-team Progress Check

Mech Gen

Aero

  • started machining roof mold

    • goal: finish roof + canopy by end of November

  • jasmine found windshield sponsor!

    • to start windshield mold after roof + canopy mold completion

  • wheel wells research started

  • only miscellaneous purchases remaining except resin

...

  • PVDR

  • ASC Update - they idk

  • Sub-team Check-ins

    • Post- First General Check

    • Progress Updates

Sub-team Progress Check

Mech Gen

Aero

  • foam in central stores, go find it

  • 20+ members staying

...

  • PVDR

  • Sub-team Check-ins

    • Post- First General Check

    • Progress Updates

Sub-team Progress Check

Mech Gen

Aero

  • ~27 new members, good position

  • foam order placed for roof mold

  • end-of-month to get all foam blocks machined (graeme)

  • rework tasks for bathtub happening

  • thermoforming sponsorship in the works ??

...

  • ~25 people out to 101

  • HW validation with PD

  • FW members waiting for tasks

    • need more HW people to get boards done

    • AFEs as well?

  • Priority

    • solar testing

    • MCI

    • BMS boards

...

September 2023

Sunday

Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

3

4

5

6

SDC Design Team Showcase

3 - 5 PM

  • “open-house” style

7

First General

  • 7 - 9 PM in Rm 4417

8

9

Sub-team 101s

10

11

Competition Overview (All teams)

12

13

14

15

Hack the North (RESTRICTED BAY ACCESS)

16

Hack the North (RESTRICTED BAY ACCESS)

SDC Design Team Showcase Signup

...