Aux Battery Tested 25-ish cells (approx 60 total) CAD - need mount (will be late by few) Cells may need balancing, will add balancing taps
Deliverable: Finish the CAD for the 24th Enclosure Design overall → opening mechanism not optimal Will recad with bare min. Box will rest on the floor of aero Shem → working on removal tool Manufacturing enclosure will have to wait top, bottom, holder will print (module) Ports have been found, need to confirm Wire gauge - ? 2-6 AWG? It was determined the module holders will be epoxied to the base of the enclosure
Deliverable: Tuesday get a new timeline for the enclosure + Design review Board Mounts Integration meeting happened, got lots of info for mounts AFE almost done, carrier and current sense not Ideal for current sense and carrier to be on top of each other Saturday → sprint for mounts Redesign, two brackets instead of two brackets and top plate AFE and carrier the same size Improve space for wiring, add standoffs for the mount
PVDR Module Testing???? Manufacturing state → as soon as possible Kostubh will draft a testing procedure for the pack to validate Will be there Monday to discuss
Coulomb Counting Telemetry moved to low-priority task Looking into different integration methods for calculating SoC on STM32, should have some research by the next integrations meeting on Tuesday currently doing research on viable algorithms and will be checking in with integrations on tuesday on our next steps based on the research
This week: Apply for passes (HTN): shem, nicole, maggie, vaihbav Nicole → rch session for first years |