This is an iteration of tube removal optimization. The top 30 case failed, so this could only be pursued if that collision case is resolved.
Table of Contents |
---|
Folder Path:
D:\Users\Roo\Documents\GrabCAD\MSXIV sims\MS-CHASSIS\Spring 2021 Reinforcement Sims
File Name:
October 11_Rev10.5
This project file was created using Rev 10.4 as the base project.
Updates from Rev 10.4:
Removed one pair of rear angled spiderweb tubes.
Front Bar - PASS
Back Bar - PASS
Side 30 Wall - PASS
Side 60 Wall - PASS
A-Pillar - PASS
B-Pillar - PASS
C-Pillar - PASS
Front 30 Wall - PASS
Front 60 Wall - PASS
Top 60 - PASS
Top 30 - FAIL
Top 30 - PASS
Top - PASS
Combined Loading (Roll-Over) - Incomplete
It is the case with the pucks.
It needs to be setup using previous examples.
Advisor: Jason He
It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.