This page has been created to reflect the ongoing projects of the Material Testing Project as of Spring 2021 term.

Table of Contents

General Testing (Composites and Adhesives)

General testing encompasses aspects of the vehicle that are commonly and largely manufactured such as CF composite products and adhesive joints.

The general testing will include the following milestones and due dates:

Milestone

Due Date

Test Plans

End of May, 2021

Inventory + Supplier Interfacing

End of May, 2021

Test Setup Preparation (Test Specimen, Test Apparatus, etc.)

First two weeks of June, 2021

Onsite Testing

Last two weeks of June, 2021

Simulation of Tests

End of July, 2021

Test Report

End of July, 2021

Below are the tests that will be conducted for General Testing:

Testing

Test Standards

Test Description

Link

Composites

ASTM C393_Standard Test Method for Shear Strength

3-point bend test

ASTM C393_Standard Test Method for Shear Strength - Mechanical - Confluence (atlassian.net)

Composites

ASTM D3039_Standard Test Methods for Tensile Properties

Tensile test

ASTM D3039_Standard Test Methods for Tensile Properties - Mechanical - Confluence (atlassian.net)

Adhesive

ASTM D5868_Standard Test Method for Lap Shear Adhesion for Fiber Reinforced Plastic (FRP) Bonding

Single lap shear test

ASTM D5868_Standard Test Method for Lap Shear Adhesion for Fiber Reinforced Plastic (FRP) Bonding - Mechanical - Confluence (atlassian.net)

Design Project Testing (Specific Joints)

These tests will follow a similar project planning as the General Testing. The only difference is that the timeline would be more dependent on the needs of the design project.

Seats Testing

Spring 2021 DRI:
Kyle Justin Lacson (Deactivated) Mackenzie Lui (Mech Co-ops)

Seats Testing Documentation:
Testing - Mechanical - Confluence (atlassian.net)

Design of Experiments

Spring 2021 DRI: Ishan Saini

Design of experiments is looking to be applied in the Material Testing Project.
The goal of this project is for the team to gain familiarity with design of experiments software and see how it can improve the processes. The Material Testing Project would be the focused experiment or trial run of this.

In Spring 2021, Ishan is conducting research in the use of JMP software and how it can be applied in the team’s General Testing.

Resources

Item

Description

Link

Material Testing Tracker

Shows status of the current tests being conducted. This is because each test has stages of research, test plans, test specimen preparation, simulations, etc.

https://docs.google.com/spreadsheets/d/1gnjFr7LICVlbwWLf_AfZFGeOsmwfCrZcoJsVTokVB4Y/edit#gid=0