Research and Concept Development
Expand |
---|
Previous Fastening Brainstorming: Google drive docs |
---|
url | https://docs.google.com/document/d/18z0ozrzWEZkZP-ABfqe7ZNCzylWeLuY7BOo3UZIwl50/edit?usp=sharing |
---|
|
Google drive docs |
---|
url | https://docs.google.com/document/d/1i0WxBlhaUsCNDem_jjCmlVDZmURIcCHqT7d_WSdGYms/edit?usp=sharing |
---|
|
|
Calculations and FEA
Final Design
Expand |
---|
|
Image ModifiedSeveral base studs are to be placed around the panel where they will slot into mounts placed along the chassis Chassis mounts design are currently in progress ( Taking into account conflicting mounts as well as roof props ) The general mount design is shown below: Image ModifiedImage ModifiedTo do List: sync with roof props to check any any motion conflicts sync with side panel to resolve top tube conflict ( discussion between DRIs took place, but lead confirmation is needed ) Finalize mount design Create jigs for welding ( up to change as mount design changes )
|
Previous Fastening Brainstorming:
Google drive docs |
---|
url | https://docs.google.com/document/d/18z0ozrzWEZkZP-ABfqe7ZNCzylWeLuY7BOo3UZIwl50/edit?usp=sharing |
---|
|
...
Manufacturing and Assembly Plans