DescriptionHandles LV power distribution
Target release
Epic

ELEC-82 - Getting issue details... STATUS

Document owner
Project leads
Team members

Open Tickets

key summary type created assignee reporter priority status resolution
Loading...
Refresh

Goals

  • Distribute power to all components with maximum efficiency
  • Reliable operation

Background and strategic fit

A power distribution board is necessary to supply power to the various subsystems in the vehicle. This board performs distribution, startup, shutdown and emergency shutdown as required in regulations. In addition to supporting powering the boards, it also powers components directly, such as the horn, camera and others. 

Assumptions

  • Power to the front of the car will be through the main harness

Requirements

#TitleUser StoryImportanceNotes
1DCDC ConversionConvert ~150V to 12VDC at up to 30 AMust Have
  • Isolated DCDC Module
2Thermal ControlControl temperature of the DCDC for reliable operationsMust Have
  • Heatsink
  • Fans
3Power DistributionDistribute power to all boards and powerMust Have
  • High Side Load Switch
4ProtectionFuse each rail on the board, as well as the inputsMust Have
  • Board mounted automotive fuse


Questions

Below is a list of questions to be addressed as a result of this requirements document:

QuestionOutcome
Do we want high side or low side switching?We will do high side switching using load switches. 
Will each board be ground individually? Or a star ground?Currently, grounds return back to power distribution. However, an alternate may be to use the chassis as ground. 
How much monitoring is required for the 12V aux battery?Only monitoring voltage for ASC 2018. 

Not Doing

  • Charging the aux battery will no longer be handled by chaos




  • No labels