D:\Users\Roo\Documents\GrabCAD\MSXIV sims\MS-CHASSIS\Spring 2021 Reinforcement Sims

File Name:

September 11_Rev7.0_2 Seater + Spiderweb

This project file was created using Rev 5.1 as the base project.

All 4 passenger masses were turned on.

2 Seater + Spiderweb

Front Bar

Back Bar (Failed to Compile)

Failed to compile solution.

There were contacts between the collision object and chassis tubes that were marked as red (by the contact tool). These have not yet been resolved.

Side 30 Wall

Side 60 Wall

A Pillar

B Pillar

C Pillar

Front 30 Wall

Front 60 Wall

Top 60 Wall

Top

Top 30 Wall

Combined Loading (Roll-Over) - Incomplete

It is the case with the pucks.

It needs to be setup using previous examples.

Advisor: Jason He

It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.

Spiderweb

Generate results only if the 2 Seater + Spiderweb configuration passes

Front Bar

Back Bar (Failed to Compile)

Failed to compile solution.

There were contacts between the collision object and chassis tubes that were marked as red (by the contact tool). These have not yet been resolved.

Side 30 Wall

Side 60 Wall

A Pillar

B Pillar

C Pillar

Front 30 Wall

Front 60 Wall

Top 60 Wall

Top

Top 30 Wall

Combined Loading (Roll-Over) - Incomplete

It is the case with the pucks.

It needs to be setup using previous examples.

Advisor: Jason He

It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.

2 Seater

Generate results only if the Spiderweb configuration passes

Front Bar

Back Bar (Failed to Compile)

Failed to compile solution.

There were contacts between the collision object and chassis tubes that were marked as red (by the contact tool). These have not yet been resolved.

Side 30 Wall

Side 60 Wall

A Pillar

B Pillar

C Pillar

Front 30 Wall

Front 60 Wall

Top 60 Wall

Top

Top 30 Wall

Combined Loading (Roll-Over) - Incomplete

It is the case with the pucks.

It needs to be setup using previous examples.

Advisor: Jason He

It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.