This page will outline the roles and responsibilities + action plan for the Fall '21 term!

Agenda

  • Determine tasks that need to be completed before next term starts

  • Determine goals and responsibilities for next term

    • onsite leads, offsite leads, and onboarding leads

Term Transition Goals

Below is an outline of the tasks that need to be completed before the Fall term starts

Details

Priority

Final designs for board sendoff

  • Pedal, Precharge, UV Cuttoff?, Solar?

HIGH

Complete wiring diagram

HIGH

Term Goals

To have a functioning electrical system that our team has confidence in (smile)

Spring Term:

  • Assembling Final Versions of Boards

  • Complete all board mounts

  • Complete all harnesses

  • Complete all enclosures

  • Assemble all items

No specific dates since COVID might just screw everything up… will use time estimates 😢

Details

Priority

Timeline

Assembling final versions of boards

  • PD, Lights, Steering, Solar, UV Cutoff, BMS Carrier

HIGH

4 months

Explore MPPT Issues

MEDIUM

Validation / Testing

  • Powertrain, MCI

  • Charger Interface

    • Elcon Charger to mockup battery

  • Precharge

  • BMS

    • Connect power supply to each channel, verify lower and upper faults

  • Solar Sense → can test outside (tongue) (MPPT layout)

  • Don’t have a load to test motors… Need to put it on the car

MEDIUM

Further testing motors depends on mech (need rolling chassis)

BMS → dependent on battery, also need BMS Carrier assembled

HV integration into mockup

LOW

Telemetry, Headlights and Cameras (w/ Interiors)

LOW

Sorry, Renzo

Carryover from Fall 2020

Carryover from Winter 2021

All onsite tasks:

  • Assembling final versions of boards (HW)

    • PD

    • PS (done)

    • Steering

    • Lights

    • Solar

    • UV Cutoff

    • Centre Console (done)

    • Current Sense (done)

  • Motor Sense Validation (HW)

    • At the stage of integrating Sense to Controllers

    • Blocks all of Power Train

  • High voltage testing (HW)

    • Integration Testing

    • Blocked by Motor Sense Validation

    • Blocked by Pre-Charge integration testing

  • Assemble final versions of most boards (excl. AFE, DCDC, Charger interface, MCI) (January)

    • HW validation for new versions

    • Notes:

      • Aashmika has the reflow at home to assemble most boards

      • if lockdown happens, this can still be done at Aashmika’s house.

    • Unit test boards once they return

      • if designs are flawed, board needs to be resent (at any stage)

  • Integrate into mockup (February) - must be onsite

    • Displays

    • Horn

    • Cameras

    • Telemetry Router

  • Mockup Testing

    • Solar

    • BMS Full (Pending Battery pack, and other testing)

    • MCI, Limit testing for Motors (includes carryover from F2020)

    • Full Mockup Integration (w/ displays)

    • Worst case: bleed into Spring

  • Complete all harnessing/make diagram for full vehicle (near EOT)

    • Includes layout

    • Note: this is offsite, if lockdown, will move this task to Jan

  • Finalize Enclosures Layout
    (to plan for post W2021)

Spring Term

  • Assembling Final Versions of Boards

  • Complete all board mounts

  • Complete all harnesses

  • Complete all enclosures

  • Assemble all items

See full documentation here

Core Team

Name (Term)

Responsibilities

On-Site Capacity

Aashmika (Co-op)

• Assembly of final versions of boards
• Precharge

• Onsite

Micah
(Co-op)

•Offsite, limited capacity

James L
(School)

• Assembly of final versions of boards
• Telemetry Diagram

• Remote, will in in-person in Fall 2021
• Most likely can’t help

Nita
(School)

• Assemble PD (reflowed on side, hand-assembled the other side)
• Task force for diagram making

• Remote
• Can maybe visit on weekends but will be overloading during the term

Liam
(School)

• Assembly of final versions of boards

• Remote
• has equipment to do assembly / validation without being in loo

Kristen
(Co-op)

Ricky
(School)

Janvi

Alastair

Lucy

Odianosen

Onboarding

Knowledge Share

Lead

Date

Week 1 - Electrical Overview

Week 2 - Board Lifecycle

Week 3 - Regulations

Week 4 - Energy Throughout Solar Car

  • Goal for this term

    • a intro to the electrical sub-systems 2.0

  • Previous onboarding

    • a intro to the electrical sub-systems

    • design a board

    • how to be useful onsite

  • Engagement ideas (after members watch videos)

    • Jump on a call to do worksheets together

    • Kahoot

Purchases

Item(s)

Estimate Price

Source

board sendout (midterm)

WEEF W2021

ENGSOC W21

WEEF F2020

WEEF F2020

WEEF W2021

Tasks for Off-site Members

Task

Difficulty

Notes

Power Consumption Evaluation

MODERATE

Wiring Diagram

MODERATE

Component Investigations

EASY / MANAGEABLE

  • Reviews for all tasks together (smile)

    • Last Saturday of each month? Extended standup 😞

  • Buddy system (2-3 members w/ a lead)

    • Leads combine tasks to have groups work on them together (Kristen (smile))

    • Saturday work sessions

    • Standups once a week → Wednesdays

Expectations for Next Term

  • RETAIN MEMBERS 😃

  • Join On-Site weekly standups to get a better grasp of overall elec progress, improve knowledge

Next Steps

  • Kristen S to get everyone ready for onsite work (safety plan, etc.)

Term Layout - Remote Tasks

  • Wednesday standup to go over group progress - groups will give updates together

  • Saturday working sessions where everyone works together on discord and can separate into channels for specific questions