Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

ASSEMBLY PLAN

General Notes

  1. Dry-Run Clamping

  • Place the chassis upright, and lift the chassis using a platform to make it easier to access the tubes where the adhesive would be applied

    • Handle the chassis with care, to prevent scratching or chipping the powder coat when handling

  • Use C-clamps to secure the floor panels to the chassis' bottom reinforcement, seatbelt and A-plane tubes (as pictured, below)

  • Distribute weights as evenly as possible, along the medial sections of the panels (as pictured, below)

  • Add extra weights or clamps where necessary to close any gaps between the floor panels and chassis

    • Avoid over clamping as this can damage he carbon fibre panels and/or squeeze out any adhesive between the panel and chassis

  • Take pictures of the final set-up and areas where there may be any gap

  1. Surface Preparation

  2. Application of Adhesive

  3. Clamping and Curing

  • No labels