There was a meeting on 2021.05.22 that helped revise the stage 2 deliverables.
See meeting notes here: https://uwmidsun.atlassian.net/wiki/spaces/MECH/pages/2486042671/Structural+FEA+Meeting+Notes#2021.05.22
Stage | To-Do List | Status | DRI | Due Date |
---|---|---|---|---|
2 | Chassis Post-Welding Analysis | Blocked until we can be on campus. Need to measure and 3D model the chassis for simulation and interference checks | ASAP Serves as another validation step for the reinforcement solution method | |
1 | Down select material choice for panel solution through research (CF sandwich panel, aluminum sheet metal, steel sheet metal) | Incomplete | Done | |
1 | Get updated masses for vehicle assembly | Incomplete S2021 Updated Masses of Sub-Team Assemblies - Mechanical - Confluence (atlassian.net) | ASAP | |
1 | Exploration of collision object settings and rationale | Incomplete | ||
1 | Mesh Convergence Studies on tube solutions simulations | Incomplete | ||
1 | Exploring running the bar into the chassis? Find force then push? | Not decided on yet | ||
2 | Structural Reinforcements Solution Simulations | Incomplete | May 28th |