Floor Panel-Chassis Integration
ASSEMBLY PLAN
General Notes
1. Dry-Run Clamping
Place the chassis upright, and lift the chassis using a platform to make it easier to access the tubes where the adhesive would be applied
Handle the chassis with care, to prevent scratching or chipping the powder coat when handling
Use C-clamps to secure the floor panels to the chassis' bottom reinforcement, seatbelt and A-plane tubes (as pictured, below)
Distribute weights as evenly as possible, along the medial sections of the panels (as pictured, below)
Add extra weights or clamps where necessary to close any gaps between the floor panels and chassis
Avoid over clamping as this can damage he carbon fibre panels and/or squeeze out any adhesive between the panel and chassis
Take pictures of the final set-up and areas where there may be any gaps between the panels and chassis, for reference
2. Surface Preparation
Sand off the powder coat and decarburization layer using the dremel and a sanding bit. The resulting surface should be silver and shiny (pictured below, reference image taken from the Bottom Panel-Chassis Integration Assembly Plan)
Wear safety glasses and KN95 masks while sanding
3. Application of Adhesive (Instructions below are referenced from the Bottom Panel-Chassis Integration Assembly Plan)
Wear gloves when handling chemicals and the epoxy adhesive
Clean the sanded surfaces of the chassis tubes using a cleaning product (stored
on the top shelf of the chemical cabinet along with adhesives) and a damp paper
towel. Then dry the surfaces completely.Find 50 ml cartridges of LOCTITE EA E-120HP - Epoxy adhesive
The working time of the adhesive is 2 hours. Start a timer once mixing has
started in the nozzle.One person should apply adhesive to the chassis tubes using the applicator and
at least one other person should spread it with a wooden mixing stick (found in a
box beside the chemical cabinet). Add more adhesive as necessary until the
surface is fully coated (see example below).
4. Clamping and Curing
Place the floor panels on the chassis and ensure it is aligned
Use the A-plane as a reference edge for the front two panels
Place the back two panels flush against the C-bulkheads
Replicate the final clamping assembly as from the dry-run
Fill any gaps between the panels and chassis tubes with adhesive, to ensure the adhesive is making contact with both components
Let the adhesive cure for 24 hours before removing the C-clamps and weights