Responsible Ppl: Nicole (Lead) + Ishan & Kirsten (DRI))
Goal: Finish 90% of design of V1, a functional design, with the goal of tweaking module + finishing a design of V2 by the end of S25
All members will work together on one CAD file to design, while leads will oversee and provide suggestions
Weekly meetings will be held to ensure the team can finish the design on time
Time of meetings: TBD
Overview: The battery module contains all contains all of the car’s modules, and electrical components:
Requirements/Things to Consider:
Busbar design to be easily manufacturable, consisting of water-jetting one sheet of metal: hoto: https://www.instagram.com/p/CrpJz0UrHTb/?img_index=1
Previous Resources:
Download previous CAD model here: ____
Pop by the design team bay to take a look in real-life