This document is intended to be an extended version of the testing plan from the PVDR (preliminary vehicle design report).
Prototype Module Testing:
Click here to expand...
Purpose: Validate that our manufacturing procedure yields a module that can function in all realistic discharge scenarios
Tests:
Module Resistance
Use Fluke multimeter to check resistance on terminals of battery module. (Don’t use other brands as they may not be as accurate)
Test: Measure module internal resistance. Follow this tutorial: https://www.youtube.com/watch?v=av38iBxcOgQ
The cells in 4S8P configuration alone, based off of the datasheet internal resistance (IR) should have an IR of 0.015ohms (0.012 - 0.018ohm considering variation)
Information gained: The measured internal resistance should tell use how much resistance is introduced from out spotwelds and busbars (indication of how good our spotwelds are)
Nominal Current Test
Based on energy budget calculations, we can afford to have a nominal current of 4.54A Energy Budget and Average Current Draw Calculations
Test: Discharge for 8h at 4.54A to simulate a full race day
Information gained: The temperature rise from normal operations. (if this is too high then we may not want to use epoxy on cells)
High Current Test
Our modules are rated for a max discharge of 52.4A
Test: Draw 52.4A from module for 10 min
Information gained: Temperature rise from max discharge, visual observations of module in case anything unexpected occurs
Production Module Validation:
Pack and Electrical System Validation: