Controller Board
| Validation Steps | Status | Blockers |
---|
CAN | | IN PROGRESS | |
GPIO_IT | | IN PROGRESS | |
ADC | | DONE | |
I2C | | IN PROGRESS | |
SPI | - General Hardware verification
| BLOCKED | Need SPI sensor to test further |
| | | |
| | | |
Power Distribution
| Validation Steps | Status | Blockers |
---|
Outputs | - Verify Operation of IO expanders using smoke test Adhiraj Singh Arvind Sanjay
- Verify Operation of Load switches using bts_load_switch driver
- Verify Operation of Outputs using Output Config
| IN PROGRESS | |
Fan Controllers | - Develop Smoke Test
- General hardware verification of Fan Controllers
| IN PROGRESS | |
Output Read verification | - Verify Outputs are successfully read in main loop
| BLOCKED | Need gpio expanders verified |
Lights FSM verification | - Verify by setting can messages internally
- Verify by sending can messages over PEAK CAN
| BLOCKED | Need all previous verified |
Power FSM Verification | - Verify by setting can messages internally
- Verify by sending can messages over PEAK CAN
| BLOCKED | Need all previous verified |
Telemetry
| Validation Steps | Status | Blockers |
---|
HC-12 | - Develop basic tooling and verify connection/data transfer
| IN PROGRESS | Getting hardware |
LoFa | - Develop basic tooling and verify connection/data transfer
| | |
| | | |
| | | |
| | | |
UV Cutoff
| Validation Steps | Status | Blockers |
---|
Load Switch | - Check that load switches work, and isense can be read
| IN PROGRESS | |
VBAT_Status | - Trigger Undervoltage conditions, see if it triggers interrupt.
| | |
| | | |
| | | |
| | | |