Controller Board

Validation Steps

Status

Blockers

CAN

IN PROGRESS

GPIO_IT

IN PROGRESS

ADC

DONE

I2C

IN PROGRESS

SPI

  • General Hardware verification

BLOCKED

Need SPI sensor to test further

Power Distribution

Validation Steps

Status

Blockers

Outputs

  • Verify Operation of IO expanders using smoke test
  • Verify Operation of Load switches using bts_load_switch driver
  • Verify Operation of Outputs using Output Config

IN PROGRESS

  • Need output config merged for last verification

Fan Controllers

  • Develop Smoke Test
  • General hardware verification of Fan Controllers

Output Read verification

  • Verify Outputs are successfully read in main loop

Lights FSM verification

  •  

Power FSM Verification

Telemetry

Validation Steps

Status

Blockers

HC-12

  • Develop basic tooling and verify connection/data transfer

IN PROGRESS

  • Need output config merged for last verification

LoFa

  • Develop basic tooling and verify connection/data transfer

UV Cutoff

Validation Steps

Status

Blockers

Load Switch

  • Check that load switches

IN PROGRESS

  • Need output config merged for last verification

VBAT_Status

  • Trigger Undervoltage conditions, see if it triggers interrupt.