Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Agenda:

  1. Mech Training Plan Overview Discussion

  2. Identifying Mech Milestones and Tentative Milestone dates

Mech Training Plan Overview Discussion

Mech Leads Design Challenge

Completed Today:

  • Timeline for Design Challenge / Training (2 months - finishing during Reading Week)

    • To be reviewed by Kevin and other advisors

Preliminary Mech Milestones and Tentative Dates

List of Milestones:

  • Research End Date (transition into design phase)

    • Will this include selection of materials for large systems (e.g. chassis tubes, body shape, etc.)?

  • Mech Design Freeze (For detailed milestones, specify subteam design freezes)

  • Start-End Welded Chassis

  • Start-End of Aero Panels

  • All Dynamics Components in-House

  • Rolling Chassis

  • Battery Modules Completed

  • VDRs Submitted - Dependent on ASC schedule (March of the competition year)

  • Finish Car (with 8 month Contingency ~30%: End of Dec 2023)

  • Start-End Testing for Full Vehicle (4 months)

  • Race Day (Early July 2024)

To do during Mech Check-in:

  • Set more dates

  • Aero-Chassis Integration

  • All Dynamics Components Ordered/Undergoing Manufacturing

  • Battery Bulk Order

  • Battery Cells Tested

  • Battery Prototype Modules Completed

  • Race Preparations (includes: driver prep, race operations, logistics to ASC, etc.)

  • No labels