Weekly Goals
Week | End of Week Goals | Notes |
---|
September 26 - October 2 | Aero: - Machine hood mold (
Tuesday) - Thursday - was not done last week - Multimatic
Aim to complete 50% of the total layup of the whole side panel- 50% of 1 half side panel is done, 30% of other half side panel - was completed
- The following will be started after side panels
- Start mold prep (polish the part, add layers to prevent sticking) on the hood mold
- bonus: Decide whether or not to split bridge mold, and prepare MDF for machining
- Dispose of the "oven" into dumpster
- Begin material preparation for the hood panel (carbon fiber, etc.)
- B-Bulkhead machining (the blank is done, waiting to ask Brian if/when he can machine it), not an urgent part
Infusion: - No more testing required!
Interiors: - Catamaran: Nothing planned for this week
Taking measurements for door handles
| - New MDF won't be worked on until reading week? But this limits concurrent work.
|
Oct 3 - Oct 9 | Aero Check-in with Brian to make sure the hood mold is machined- MDF Failed in machining - need to be disposed
- Brian has machined a bit of the hood mold using foam, to check/review tomorrow
Complete the full layup of the whole side panel- Multimatic
- Need to figure out how we want to hold vacuum on the bag @ Multimatic - will confirm with Multimatic about process
- B-Bulkhead
- need 1/2" core to be used in the panel
- (Tentatively) Weekend working sessions is on the Hood mold if side panel layup is done
Logistics to Transport Side Panel - Thurs. Working Session
- Packing materials to be ready to bring to Multimatic
- Friday
- 10:30 AM - Start loading and packing the trunks + Forklift with Graeme
- 11:30 AM - leave from Waterloo
- 1:30 PM - Arrive and unload at Multimatic
- 2:00 PM - Leave from Multimatic - Michael & Mackenzie
- 4:00 PM - Arrive at Waterloo
- Tentative
- 5:00 PM leave from Waterloo
- 7:30 PM arrive at multimatic
- 8:00 PM leave from Multimatic
- 10:00 PM arrive in waterloo and return vehicle
- Otherwise: Tuesday morning load & transport
To dos: - Book vehicle for full Friday
- Book vehicle for full Tuesday
| - Can start front bridge molds (with current MDF) - must figure out how they will be designed/manufactured
- Multimatic:
- Logistics for shipping and what we need to pack
- Logistics for vehicle rental/school vehicle
|
October 11 - 17 | Dynamics - Finish full inventory check of all assemblies (Front + Rear Suspension, Brakes, Steering)
- Create order list of all off-the-shelf parts still needed (if necessary)
- Create manufacturing list of all custom-made parts still needed (if necessary)
To Dos: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|