Weekly Goals

WeekEnd of Week Goals Notes
September 26 - October 2

Aero:

  • Machine hood mold (Tuesday) - Thursday - was not done last week
  • Multimatic
  • Aim to complete 50% of the total layup of the whole side panel
    • 50% of 1 half side panel is done, 30% of other half side panel - was completed


  • The following will be started after side panels
    • Start mold prep (polish the part, add layers to prevent sticking) on the hood mold 
    • bonus: Decide whether or not to split bridge mold, and prepare MDF for machining
    • Dispose of the "oven" into dumpster
    • Begin material preparation for the hood panel (carbon fiber, etc.)
    • B-Bulkhead machining (the blank is done, waiting to ask Brian if/when he can machine it), not an urgent part

Infusion:

  • No more testing required!

Interiors:

  • Catamaran: Nothing planned for this week
  • Taking measurements for door handles
    • now have access to CAD
  • New MDF won't be worked on until reading week? But this limits concurrent work.
Oct 3 - Oct 9

Aero

  • Check-in with Brian to make sure the hood mold is machined
    • MDF Failed in machining - need to be disposed
    • Brian has machined a bit of the hood mold using foam, to check/review tomorrow
  • Complete the full layup of the whole side panel
  • Multimatic
    • Need to figure out how we want to hold vacuum on the bag @ Multimatic - will confirm with Multimatic about process
  • B-Bulkhead
    • need 1/2" core to be used in the panel
  • (Tentatively) Weekend working sessions is on the Hood mold if side panel layup is done


Logistics to Transport Side Panel

  • Thurs. Working Session
    • Packing materials to be ready to bring to Multimatic
  • Friday
    • 10:30 AM - Start loading and packing the trunks + Forklift with Graeme
    • 11:30 AM - leave from Waterloo
    • 1:30 PM - Arrive and unload at Multimatic
    • 2:00 PM - Leave from Multimatic - Michael & Mackenzie
    • 4:00 PM - Arrive at Waterloo
    • Tentative
      • 5:00 PM leave from Waterloo
      • 7:30 PM arrive at multimatic 
      • 8:00 PM leave from Multimatic
      • 10:00 PM arrive in waterloo and return vehicle
    • Otherwise: Tuesday morning load & transport


To dos:

  • Book vehicle for full Friday
  • Book vehicle for full Tuesday (question)


  • Can start front bridge molds (with current MDF) - must figure out how they will be designed/manufactured
  • Multimatic:
    • Logistics for shipping and what we need to pack
    • Logistics for vehicle rental/school vehicle 



















































  • No labels