Weekly Goals

Week

End of Week Goals

Notes

July 5 - 11

Chassis: (All done!)

  • Access to Welding Room

  • Finish sanding & assembling jigs (done)

  • Drop off parts for welding

  • Assembly more jigs

  • Welding components onto Chassis

Aero: (Bleeding into week of July 12 - due to booking conflicts with Waterloop)

  • Side Panel Molds ready by the end of this week for layup

Battery Box:

  • Continue module manufacturing

July 12 - 18

Chassis:

  • Pick up waterjet parts - End of the week

  • Sand chassis, assemble more jigs

  • Schedule welding in E5 - welding components onto Chassis

    • Clamping tubes prior to welding

Aero:

  • Finish prepping side panel molds - end of the week

  • Begin material prep for side panels layup

    • blocked by no driver - see if we have a driver???

    • drawings are ready

  • Make a decision if we want to layup both - yes to both

  • finish side panel molds 3, 4

  • b bulkheads sand, potentially make blank and machine second mold as well (based on SDC)

    • first b-bulkhead sanded

    • second b-bulkhead - in progress

Composites:

  • infusion testing Saturday

  • Double check prep work for the infusion testing session (Friday)

    • use mold release/PVA, don’t apply Loctite

July 19 - 25

Chassis:

  • Pick up waterjet parts - Early this week (Saturday)

Aero:

  • visit cold storage to pick up adhesive film

  • chassis measurements for b-bulkhead

  • layup on Thursday

    • mold release on side panel 1 and 2

    • connect the molds (molds are misaligned)

      • smooth the connection points/ends of the molds

      • adding fasteners?

    • material prep (nomex, vacuum bag, breather cloth, peel ply),

    • pick up kerosene

    • trim carbon fibre and adhesive film

Composites:

  • next infusion test will be next week - run by Michael

    • for this week, prep materials

    • Prep for a small test for Saturday to test variables

Battery Box:

  • Continuing spot welding (Wednesday)

Purchases:

  • Adhesive film for 2nd side panel (2nd week of august for material prep) - process through university

July 26 - Aug 1

Chassis:

  • Submit work request and drop off parts at E3 (Monday)

  • Sanding areas where seat belt mounts will be welded (Thu/Fri)

Aero:

  • Cure & Demold L. Side panel

  • Finish sanding R. Side Panel 3,4 molds

  • Organize prepreg in the freezer

  • Make material list for 2nd Side Panel

    • Cold Storage run?

    • Goal: Purchase list to be ready by Wednesday to be made Thursday (if going through University)

  • B-Bulkhead

    • Reach out to Brian to machine B-bulkhead mold

Composites (Infusion):

  • Testing the Glass:

    • Test #1: Pull vacuum on glass to see if it can hold vacuum (Monday/Tuesday)

    • Test #2: use wax/grease remover for glass midweek and pull vacuum (Wednesday/Thursday)

    • Test #3: Flip glass to test on other side and pull vacuum (End of Week)

  • Obtain inlet & clamps (question) from Brian

  • Infusion Test: Material Prep for test piece (before Saturday)

  • Saturday July 31st: Run Resin through part

Side panels:

  • #3 almost done

  • #4 up to 600

Purchases to be made:

  • Adhesive film for 2nd side panel (2nd week of august for material prep) - process through university (15 sqm)

  • Venturi Pump

    • possibly WEEF F21

    • Find Canadian companies

  • Purpose-built Vacuum Bag

    • Get 1 sample to test with

    • Follow up with discount or sponsorship details

Chassis:

  • Book welding room, clamp and weld seatbelt mounts (once parts at E3 are complete)

Instructions: Please fill this out BEFORE the onsite check-ins

Date

Individual

Goals for Today

Progress / Updates

Micah Black

Continued Battery Spot Welding

July 8, 2021

Mackenzie Lui, Kyle Lacson

Transport excess material to cold storage facility, set up paint guns.

Paint guns

  • No labels