Date | Individual | Goals for Today | Progress / Updates | Notes and Concerns |
---|---|---|---|---|
2021-02-27 | Continue battery assembly | Put potting compound on bottom side of 6 battery modules | Need to know how to use the Compressed air to clean parts / blow dust off them | |
2021-02-27 | Clean up | Cleaned up | ||
2021-03-08 | Cut foam core | Cut foam core | ||
2021-03-17 | Sorting chemical cabinet | labelled pre much everything in the bottom cabinet
| Mold release is officially expired, but worked for bulkheads, although will test on wheel covers | |
““ | Sealing additional side panels |
| ||
““ | Getting Daniel set up with tasks Working on Rims and pressfits | Didn’t have time for rims, sent email to Graeme asking for tips for press fits Met with Daniel to discuss safety hole drilling Added WD40 to the drill press, belt was stuck | ||
2021-03-18 | Cut carbon fibre as needed | Cut carbon fibre for clevises, got about halfway on holes for bolts. Will try to use flat boring bit tomorrow. | ||
Min Qian Lu (Deactivated) Aidan Lehal Isabella Schneider Daniel Yang | Onsite onboarding/prep work for Saturday | Gave brief molds intro Primed 1/4 side panels Checked laser cut nomex | ||
Move, Sand, and Seal other 3 of 4 portions of 1 side panel mold | Completed to-do list for today - move, sand, seal for all 4 parts of 1 side panel Primed both wheel covers Carbon fiber, adhesive are cut out Tried laser cutting nomex: Min to check over it | Check with Min tonight about Friday’s tasks | ||
Machined upright reinforcement (dynamics) | ||||
CC prep | Created stencil for rear elec base | |||
2021-03-19 | Finish holes in carbon fibre Try fitting tires using heat gun (get help?) | Got some more holes done, need to buy another spade bit Gave Rims another try, continuing on Monday when there are more people | ||
Check Nomex Prime the other 3 of 4 portions of side panel mold | primed all 4 components of the side panel molds Wheel cover molds have been primed | |||
@Labros Daniel Yang | Safety hole drilling (dynamics) | Drilled half of the safety holes to complete by Tuesday | ||
CC prep | Cut fibreglass and peel ply Bought dial indicator | |||
2021-03-20 | Jens Dekker Michael Hanley Maciek Pajak (Deactivated) Renzo Villanoy Min Qian Lu (Deactivated) | Sand 1/4 or 2/4 side panels | Sanded 1/4 side panel | |
CC prep | ||||
2021-03-22 | Tire mounting working session Make drawings for modified rack extension welding jig | Tried heating up the rims to give them more stretch, didn’t work. I think we’re gonna have to try to blow them up with fire. Made drawings for rack extension welding jig | ||
Sand 1/4 side panels Touch up Saturday's side panel Sand wheel cover Check spray paints | Sanded most of one side panel Touched up Saturday’s side panel Sanded and touched up wheel cover Checked most (if not all) cans of spray paint | Labelled the spray paint cans that are no good/ran out bad and placed them at the front of the chemical cabinet. Wheel cover needs to be checked | ||
Check for aluminum sheet Bring in MDF | Brought aluminum sheet to bay MDF in sanding room | To cut MDF at home Gluing next week | ||
2021-03-23 | Meeting with Graeme to talk about press fits (hopefully, he hasn’t finalized a time lol) | Press fits (mostly) done on hubs | ||
Organize sandpaper bin Sand side panel(s) Check wheel cover | Organized sandpaper Sanded almost all of one side panel Min checked wheel cover out?? | Sanded side panel and applied spray paint on overly sanded parts | ||
To ask professor about glass and applying Loctite | ||||
Trial run for gluing MDF | Glued 2 layers - 1.5hrs Picked up polycarbonate sheets | Learn how to vaccuum bag mold to cure | ||
2021-03-24 | Check fit of hub spacers on motor, then press dowels into spacers Dowels into hub nut torquing tool Hand off machining task of rack extension welding jig | |||
Drop off polycarbonate to Krew Check mold |