...
Stage | To-Do List | Status | DRI | Due Date | |||
---|---|---|---|---|---|---|---|
2 | Chassis Post-Welding Analysis | Blocked until we can be on campus. Need to measure and 3D model the chassis for simulation and interference checks | ASAP Serves as another validation step for the reinforcement solution method | ||||
1 | Down select material choice for panel solution through research (CF sandwich panel, aluminum sheet metal, steel sheet metal) | IncompleteDone | Done | ||||
1 | Get updated masses for vehicle assembly | IncompleteDone but could be improved S2021 Updated Masses of Sub-Team Assemblies - Mechanical - Confluence (atlassian.net) | ASAP | 1 | Exploration of collision object settings and rationale | Incomplete2021.06.05 | |
1 | Vehicle Collision + Collision Object Setup Exploring running the bar into the chassis? Find force then push? | In Progress | |||||
1 | Mesh Convergence Studies on tube solutions simulations | Incompletecould be improved | 1 | Exploring running the bar into the chassis? Find force then push? | Not decided on yet | ||
2 | Structural Reinforcements Solution Simulations | IncompleteIn Progress - Blocked by remote desktop offline | May 28th | ||||
1 | Research on Sheet Metal Design Space in terms of ASC Regs, Occupant Cell/Space requirements, Assembly Interference, and component design of Sheet metal mounting | In Progress | |||||
1 | Updated Mass and Assembly | Done - But could be improved |