Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Enclosure (Responsible Ppl: Nicole (Lead) + Sean Ishan & Sargam Kirsten (DRI))

Goal: Begin design sprint + finish 90% Finish 90% of design of V1, a functional design, with the goal of tweaking module + finishing a design of V2 by the end of S25

Overview: The battery enclosure module contains all contains all of the car’s modules, and electrical components:

Timeline:

 

...

  • 2-weeks - research & study design restraints + requirements

  • Design & weekly meetings

**insert photos here

Requirements/Things to Consider:

 

...

...

Previous Resources:

  • Download previous MSXV CAD model here: ____Pop by the design team bay to take a look in real-life