Trying to remove all added gussets.

This is an iteration of optimization focusing on the sheet metal. The change was very minor, just cutting down the width of the sheet metal reinforcement. The length of the sheet metal has already been experimented with a little bit in Rev 9 models.

Another idea for future reductions to the amount of sheet metal needed would be to cut the sheet metal down into individual gussets for each joint. Or possibly cut the sheet metal into 2 long strips to remove some material from the center of the sheet metal.

Table of Contents

Folder Path:

D:\Users\Roo\Documents\GrabCAD\MSXIV sims\MS-CHASSIS\Spring 2021 Reinforcement Sims

File Name:

October 13_Rev10.6

This project file was created using Rev 10.4.1 as the base project.


Updates from Rev 10.1:

  • The sheet metal width was reduced so that it was about as wide as the catamaran tubes.


Front Bar - PASS

Image Added

Image Added

Back Bar - PASS

Image Added
Image Added

Side 30 Wall - PASS

Image Added

Image Added

Side 60 Wall -

PASS

FAIL

Image Added

Image Added

A-Pillar -

PASS

FAIL

Image Added

Image Added

B-Pillar - PASS

Image Added

Image Added

C-Pillar - PASS

Image Added

Image Added

Front 30 Wall - PASS

Image Added

Image Added

Front 60 Wall - PASS

Image Added

Image Added

Top 60 - PASS

Image Added

Image Added

Top 30 - PASS

Image Added

Image Added

Top -

PASS

FAIL

Image Added

Image Added

Combined Loading (Roll-Over) - Incomplete

It is the case with the pucks.

It needs to be setup using previous examples.

Advisor: Jason He

It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.