TEAM: Daphne Lai (Deactivated) Ivan Cao (Deactivated) Jieun Lee Renzo Villanoy
...
Expand |
---|
title | Thursday, October 29th |
---|
|
JIEUN RENZO Got a 3D printer over the weekend Assembly plans are coming along Kristen is planning to purchase soon (click bonds, MDF, and mold stuff) Start researching MDF CNC
IVAN |
Expand |
---|
title | Wednesday October 14th |
---|
|
FABRICS (Jieun) Lovisa to look at Ethan Allan offline store Confirmed concept & fabrics Sheila to give new members tasks
FORM FACTOR (Renzo) MDF 20mm thick sheets ✅ Brackets for supplier interfacing Click bonds to be supplied through Kristen? 3D print started for testing Manufacturing can begin when MDF is delivered To update BOM
MATERIALS (Ivan) Can't use Nomex Epoxy resin Amount needed ✅ No specific product Aeropoxy PR2032
Need mold release Ask Min for sealant tape
Info |
---|
All purchases should be within this term |
|
Expand |
---|
title | Saturday September 12th (Renzo & Micah Black) |
---|
|
CAD changes Send model numbers and CAD to Renzo (Micah) Raise rear elec enclosure walls at firewall Change 4 fans to 3 and center Move rear elec back to make space for additional row of 4 fans Change holes to vertical slots on support walls and open up sections for wiring Move latch cover away from contactor Move wire openings to top of rear elec divider walls Add clickbond studs to third rear elec bottom panel Fillet corners on rear elec bottom panels Redesign battery module securing brackets with extra vertical support (try to minimize number of fasteners) and do bending calculations Add connection ports to port cover Move port cover in between PCBs Image RemovedImage RemovedImage AddedImage Added |
Expand |
---|
title | Tuesday September 8th |
---|
|
Image Added |
Expand |
---|
title | Friday September 4th |
---|
|
Image Added |
Expand |
---|
title | Saturday August 29th |
---|
|
|
...