Please note before we get into HV testing, that proper safety precautions must be taken to minimize the risk associated with high voltages. Proper PPE must be worn to protect This includes protecting from dangers like exploding capacitors and careful use of equipment such as the HV supply and oscilloscope.

...

  1. Maximum Drain Voltage – Verify that VDS of InnoSwitch4-CZ does not exceed the maximum continuous drain voltage and SR FET do not exceed 90% of breakdown voltages at the highest input voltage and peak (overload) output power in normal operation and during start-up.

  2. Maximum Drain Current – At maximum ambient temperature, maximum input voltage and peak output (overload) power. Review drain current waveforms for any signs of transformer saturation or excessive leading-edge current spikes at start-up. Repeat tests under steady-state conditions and verify that the leading edge current spike is below ILIMIT(MIN) at the end of tLEB(MIN). Under all conditions, the maximum drain current for the primary switch should be below the specified absolute maximum ratings.

  3. Thermal Check – At specified maximum output power, minimum input voltage and maximum ambient temperature, verify that temperature specification limits for InnoSwitch4-CZ IC, transformer, output SR FET, and output capacitors are not exceeded. Enough thermal margin should be allowed for part-to-part variation of the RDS(ON) of the InnoSwitch4-CZ IC. Under low-line, maximum power, a maximum InnoSwitch4-CZ SOURCE pin temperature of 110 °C is recommended to allow for these variations.

(Source : Innoswitch4-CZ Datasheet)

Voltage Test at Test Points

...

(Also use R10 current shunt for current sensing if necessary .)to validate)

This includes measuring the voltage drop over the shunt with DMM and using Ohm’s Law. The purpose if verify the accuracy of our readings. Could add a column in PCS Test Table to show percent deviation?

Voltage Regulation:

Procedure

...

Test at different current loads and modulate to see if there's any issues

(need to make a plan for this)

Overall everything can be tested and Recorded through:

https://docs.google.com/spreadsheets/d/1j4ExuqtmNUZ8RIEcoD0iXZhGC9C0vgVWgL9Wz4GZ-gI/edit?usp=sharing

Tools:

  • Load Tester

  • Oscilloscope

Procedure

  • Set Load Tester to CC mode, and set to 1-5A to test

  • Use oscilloscope at output

  • See and note voltage regulation (+/- 10%)

  • Comment any discrepancies

Input Amperage

Voltage Regulation

1A

2A

3A

4A

Results:

Efficiency: 

(show average efficiency of PCS board)

...