Prerequisite: Cell testing must be complete

...

  1. 100A complete discharge/charge test

  2. Equipment

    1. Keysight N3300A electronic load (with associated electronic load modules)

    2. a current shunt resistor

    3. 2 Keysight 34465A DMMs - one to measure the current via the current shunt, and one to measure the voltage of the first series group

    4. Keysight U5855A thermal camera

  3. Internal resistance test? Capacity test?

...

https://uwmidsun.atlassian.net/l/cp/PTFyj8dV

...

  • Charge / Discharge test procedure?

  • Internal resistance test? Capacity test?

  • What other tests?

  • Where did you find the equipment?

  • [not complete, feel free to add]

Miscellaneous Links

Pack Testing, BMS Testing is still left…

...