Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Stage

To-Do List

Status

DRI

Due Date

2

Chassis Post-Welding Analysis

Blocked until we can be on campus. Need to measure and 3D model the chassis for simulation and interference checks

Kimberly Liu (Deactivated)

ASAP

Serves as another validation step for the reinforcement solution method

1

Down select material choice for panel solution through research (CF sandwich panel, aluminum sheet metal, steel sheet metal)

Done

Kimberly Liu (Deactivated)

Done

1

Get updated masses for vehicle assembly

Done but could be improved

S2021 Updated Masses of Sub-Team Assemblies - Mechanical - Confluence (atlassian.net)

Tommy Tran

2021.06.05

1

Vehicle Collision + Collision Object Setup

Exploring running the bar into the chassis? Find force then push?

In Progress

Kimberly Liu (Deactivated)

2021.06.05

1

Mesh Convergence Studies on tube solutions simulations

In Progress - Blocked by remote desktop offlinecould be improved

Tommy Tran2021.06.05

2

Structural Reinforcements Solution Simulations

In Progress - Blocked by remote desktop offline

Min Qian Lu (Deactivated)

2021.06.05Aidan Lehal

1

Research on Sheet Metal Design Space

in terms of ASC Regs,

Occupant Cell/Space requirements,

Assembly Interference, and

component design of Sheet metal mounting

In Progress

Jens Dekker

1

Updated Mass and Assembly

Done - But could be improved

Tommy Tran