Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

ProjectTasksEstimated DurationPriorityLeads
Pedal Board
  •  Use CAN to communicate with the main system
  •  Consider using a potentiometer instead of the existing magnetic sensor
  •  Talk with the mechanical team able any board dimension change
2 MonthsHigh

Kelly, Jenny, Justin


Steering Stalk
  •  Use CAN to communicate with the main system
  •  Make sure the new steering stalk has sufficient mechanical clearance
2 MonthsHighKelly & Aashmika

Center Console

  •  Use CAN to communicate with the main system
  •  Resign the buttons for greater electromagnetic interference immunity
2 MonthsHighKelly & Liam
Telemetry
  •  Find a router and a LTE shield for Telemetry
2 MonthsMediumPei, Felix
BMS AFE
  •   Redesign for higher discharge capability and more reliability
2 MonthsMedium

Taiping

Josh Justin

BMS Carrier
  •  Implement a kill switch with greater electromagnetic interference immunity
2 MonthsMediumTaiping

BMS Current Sense

  •  Higher accuracy by using a different ADC
2 MonthsMedium

Taiping &

Rishi

Controller Board
  •  Consider using a different microcontrollermicro-controller
-LowKelly

Validation & Integration Projects

ProjectTasksEstimated DurationPriorityLeads
Motor Controller Interface
  •  Investigate the communication issue with the motor controller
2 WeeksVery HighHanna

Solar Sense

  •  Validation
1 MonthMediumPei

Power Distribution

  •  Finish the board bring-up & soldering
  •  Validation & Integration
2 WeeksHighKelly
Driver Display
  •  Validation & Integration
1 MonthMediumKelly
Pre-Charge
  •   Validation & Integration
1 MonthMedium

Hanna

Josh

EV Charger
  •  Integration
2 WeeksMediumHanna Justin

Timelines

Design Projects

Sep 22 - Project Assignment & Research

...