#TitleUser StoryImportanceNotes
1DCDC ConversionConvert ~150V to 12VDC at 15AMust Have
  • Isolated DCDC Module
2Thermal ControlControl temperature of the DCDC for reliable operationsMust Have
  • Heatsink
  • Fans?
3Power DistributionDistribute power to all boards and powerMust Have
  • MOSFETS

User interaction and design


Questions

Below is a list of questions to be addressed as a result of this requirements document:

QuestionOutcome
Do we want high side or low side switching?
Will each board be ground individually? Or a star ground?
How much monitoring is required for the 12V aux battery?ASC only requires under voltage protection for the supplemental battery, more clarification is needed for WSC

Not Doing

  • Charging the aux battery will no longer be handled by chaos