  • All boards must include title block with board name, Rev X.Y (see below), designer(s), and date the board was sent to fab
  • All boards must have 4 mounting holes of [size TBD]

Part Creation

Schematic Symbol

...

  • All carrier boards will power controller boards through mezzanine

Mechanical Standards

  • All mounting holes

Hardware Revisions

  • Hardware revisions will be denoted by Rev X.Y
    • X refers to the major revisions, so every time a new version of the board is fabricated, the revision is now Rev X.0
    • Y refers to minor revisions prior to fabrication, so each time things are changed after a review
      • All boards must be reviewed by the electrical leads prior to fabrication
  • All revisions should be properly documented on Confluence under the appropriate project page

...