This document is intended to be an extended version of the testing plan from the PVDR (preliminary vehicle design report).
Prototype Module Testing:
Expand |
---|
Purpose: Validate that our manufacturing procedure yields a module that can function in all realistic discharge scenarios Tests:
Test set-up: Attach module to module connections with M4 bolts, Belville disc springs, and regular washers in this stack up ( Nut - Washer - Busbar - Contact Grease - Busbar - Washer - Springs - Bolt ). Torque the M4 connections to 2.4 N*m. This way we can see from the tests how good the connections between modules are (IR introduced) and if the module-module connections introduce any issues. |