Project Validation

Project

Status

Blockers

Completion Date

AFEs

Status
titleHardware Validation

Power Distribution

Status
colourRed
titleBlockeD

Final PRs merged, New Hardware in transit

MCI

Status
titleHardware Validation

Current Sense

Status
colourBlue
titleReady to start

BMS Carrier

Status
colourRed
titleBlockeD

Code Completion, Current Sense + AFE Validation

Pedal

Status
colourRed
titleBlockeD

New Hardware in transit

Steering

Status
titleHardware Validation

Centre Console

Status
colourGreen
titleDone

Solar

Expand
titleController Board

Validation Steps

Status

Blockers

CAN

Status
titleIn Progress

GPIO_IT

Status
titleIn Progress

ADC

Status
colourGreen
titleDOne

I2C

...

...

titleIn Progress

SPI

  •  General Hardware verification

Status
colour

...

Green
title

...

Need SPI sensor to test further

Done

Centre Console

Validation Steps

Status

Blockers

PCA

  •  Verify outputs of IO expander

Status
colourRedGreen
titleBlockeddone

Buttons

  •  Verify button presses are read in test task
  •  Test pressing all at once, ensure all events are received

Status
colourGreen
titledone

7-Seg Display

  •  Check that you can enable/disable output
  •  Verify all 3 displays operating
Drive FSM

Status
colourGreen
titledone

Full Validation

Centre Console Validation Steps

...

Validation Steps

Status

Blockers

Outputs

  •  I2C write
  •  
  • Verify
  • operation of PCA9555 library (toggle_state, set state, init), make changes for storing values Arvind Sanjay
  •  I2C read (Mitchell Langdon Ostler)
    •  PCA get state
  •  Verify Operation of Load switches using bts_load_switch driver Adhiraj Singh
  •  Verify Operation of Outputs using Output Config Adhiraj Singh
  •  Verify current readings
  •  Verify multiplexor with current readings
  •  Trigger Undervoltage/overvoltage conditions, see if it triggers interrupt (do after everything else in case board explodes)

Status
titleIn Progress

  • Need output config merged for last verification

Output Read verification

  •  Verify Outputs are successfully read in main loop

Status
colourRed
titleBlocked

Need gpio expanders verified

Lights FSM verification

  •  Verify by setting can messages internally
  •  Verify by sending can messages over PEAK CAN

Status
colourRed
titleBlocked

Need all previous verified

Power FSM Verification

  •  Verify by setting can messages internally
  •  Verify by sending can messages over PEAK CAN

Status
colourRed
titleBlocked

Need all previous verified

Telemetry

...

Validation Steps

...

Status

...

Blockers

...

HC-12

...

  •  Develop basic tooling and verify connection/data transfer

...

Status
titleIn Progress

...

Getting hardware

...

LoFa

...

  •  Develop basic tooling and verify connection/data transfer

...

UV Cutoff

Validation Steps

Status

Blockers

Load Switch

  •  Check that load switches work, and isense can be read

Preston Glicerio Dresser

Status
titleIn Progress

VBAT_Status

  •