Project Validation
Project | Status | Blockers | Completion Date |
---|
AFEs | | | |
Power Distribution | | Final PRs merged, New Hardware in transit | |
MCI | | | |
Current Sense | Status |
---|
colour | Blue |
---|
title | Ready to start |
---|
|
| | |
BMS Carrier | | Code Completion, Current Sense + AFE Validation | |
Pedal | | New Hardware in transit | |
Steering | | | |
Centre Console | | | |
Solar | | | |
Expand |
---|
|
| Validation Steps | Status | Blockers |
---|
CAN | | | | GPIO_IT | | | | ADC | | | | I2C | |
|
...
...
| | SPI | - General Hardware verification
| |
|
...
...
Need SPI sensor to test further
Centre Console
| Validation Steps | Status | Blockers |
---|
PCA | - Verify outputs of IO expander
| Status |
---|
colour | RedGreen |
---|
title | Blockeddone |
---|
|
| |
Buttons | - Verify button presses are read in test task
- Test pressing all at once, ensure all events are received
| | |
7-Seg Display | - Check that you can enable/disable output
- Verify all 3 displays operating
Drive FSM | | |
Full Validation | Centre Console Validation Steps | | |
...
| Validation Steps | Status | Blockers |
---|
Outputs | - I2C write
- Verify
operation of PCA9555 library (toggle_state, set state, init), make changes for storing values Arvind Sanjay - I2C read (Mitchell Langdon Ostler)
- Verify Operation of Load switches using bts_load_switch driver Adhiraj Singh
- Verify Operation of Outputs using Output Config Adhiraj Singh
- Verify current readings
- Verify multiplexor with current readings
- Trigger Undervoltage/overvoltage conditions, see if it triggers interrupt (do after everything else in case board explodes)
| | | | |
Output Read verification | - Verify Outputs are successfully read in main loop
| | Need gpio expanders verified |
Lights FSM verification | - Verify by setting can messages internally
- Verify by sending can messages over PEAK CAN
| | Need all previous verified |
Power FSM Verification | - Verify by setting can messages internally
- Verify by sending can messages over PEAK CAN
| | Need all previous verified |
Telemetry
...
Validation Steps
...
Status
...
Blockers
...
HC-12
...
- Develop basic tooling and verify connection/data transfer
...
...
Getting hardware
...
LoFa
...
- Develop basic tooling and verify connection/data transfer
...
UV Cutoff
Validation Steps | Status | Blockers | Load Switch | - Check that load switches work, and isense can be read
Preston Glicerio Dresser | VBAT_Status |