Table of Contents |
---|
...
Specification | Value | ||||
---|---|---|---|---|---|
Shocks from MSXIV | Spring Force: https://www.ridefox.com/family.php?m=bike&family=floatx2 | ||||
Chassis and Suspension Geometry (assume the chassis and control arms can withstand the loads already) |
| ||||
Mass of Vehicle | 192kg | ||||
Center of Gravity Location | |||||
Loading Conditions | |||||
Assembly Max Height | Final bellcrank, clevis, and pushrod assembly should not exceed 100mm past the top or bottom chassis members. |
...
The review sessions will be held to share ideas, get feedback, and inspire your teammates! The following deliverables should be presented in a Slide Deck** (MAX 5 slides per presentation (or 5 mins) with 5-10 minutes for feedback/questions):
End of Phase 1:
TO BE COMPLETED FOR JAN 15: 3 Concepts sketched and labelled (1,3)
TO BE COMPLETED FOR JAN 22: load distribution calculated (2), detailed design of one concept in SolidWorks (4), and all required specifications for components (5,6,7).
...