WeekEnd of Week Goals Notes
September 26 - October 2

Aero:

  • Machine hood mold (Tuesday) - Thursday - was not done last week
  • Multimatic
  • Aim to complete 50% of the total layup of the whole side panel
    • 50% of 1 half side panel is done, 30% of other half side panel - was completed


  • The following will be started after side panels
    • Start mold prep (polish the part, add layers to prevent sticking) on the hood mold 
    • bonus: Decide whether or not to split bridge mold, and prepare MDF for machining
    • Dispose of the "oven" into dumpster
    • Begin material preparation for the hood panel (carbon fiber, etc.)
    • B-Bulkhead machining (the blank is done, waiting to ask Brian if/when he can machine it), not an urgent part

Infusion:

  • No more testing required!

Interiors:

  • Catamaran: Nothing planned for this week
  • Taking measurements for door handles
    • now have access to CAD
  • New MDF won't be worked on until reading week? But this limits concurrent work.
Oct 3 - Oct 9

Aero

  • Check-in with Brian to make sure the hood mold is machined
  • Complete the full layup of the whole side panel
  • Multimatic
    • Need to figure out how we want to hold vacuum on the bag @ Multimatic 
  • (Tentatively) Weekend working sessions is on the Hood mold if side panel layup is done


  • Can start front bridge molds (with current MDF) - must figure out how they will be designed/manufactured
  • Multimatic:
    • Logistics for shipping and what we need to pack
    • Logistics for vehicle rental/school vehicle