Task as of March 22 '21

Base design

Ribs design

Ribs design

Base design

Lead

Base design

REQUIREMENTS AND CONSTRAINTS

Archive of tasks and goals

Team member

Aidan Lehal

Abdelrahman Hassouneh (Unlicensed)

Mohamed Goha

Salman Rasheed

Min Qian Lu (Deactivated)

Task as of March 22 '21

Material, solar array and bonding solutions

Validating that the roof can be done in this manner

Creating process to create CAD

SI/speccing. Will work closely with Aiden. Currently finding aluminum

Lead

Status

Looks good

glue

  • Material, solar array, and bonding solutions

    • Find material that is suitable both for ribs and top sheet

      • ribs must be held to a high degree of dimensional tolerance

      • 3/4” MDF had a history of cracking at ETS. We can either increase number of ribs, change the slot geometry on the ribs, or somehow decrease load on each rib

      • also, consider build surface. At ETS, they used a jig of sorts

    • Solar array

      • want to include solar cut-outs on our mold

      • probably brainstorm ideas and run them by Brian from E5

    • Bonding

      • bond ribs and top sheet

      • would be nice to avoid welding but need a solution that is still sturdy

...