Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Compiling notes, tips, and instructions on various stages of Aero-Chassis Integration

W21 - Aero-Chassis Integration Resources

Adhesives Information:

...

Adhesive Usage: LOCTITE EA E-120HP - Epoxy adhesive - Henkel Adhesives (henkel-adhesives.com)

Part Bonded to Chassis

No. of 50mL Cartridges Used

Front + Rear Bulkheads

2.5

General Advice:

Google drive docs
width720
showLinktrue
urlhttps://docs.google.com/document/d/1wmkFvQsqSaN1GGaaAws0sL8bsXJgBMXaQ7hjFhtbwMA/edit?usp=sharing
height500

...

200

Panel Integration Planning [WORK IN PROGRESS]:

...

Order of Integration

  • A, C Bulkheads

  • Bottom Panel

Dynamics Assembly / Panel Manufacturing

  • B-Bulkhead

Panel Trimming & Painting / Interiors Assembly

  • Floor Panels

  • Side Panels

  • Doors

  • Hood

  • Headlights

Removable Panels

  • Windshield

  • Roof

  • Trunk

Order of Panel Trimming

  1. Bottom Panel - trimmed using mold outline

  2. Bulkheads - trimmed using a stencil

  3. Side Panels - trimmed using mold outline, clamp to chassis, trim to fit with bottom panel

  4. Trunk - trimmed using mold outline, clamp to chassis, trim to fit with bottom panel and side panel

  5. Roof - trimmed using mold outline, clamp to chassis, trim to fit with side panels

  6. Hood - trimmed using mold outline, clamp to side panels and trim to bottom and side panels

  7. Doors - trimmed using mold outline, trim to side panels

  8. Floor panels - trimmed using a stencil (?), trim to fit within chassis, bulkheads and seats

Panel Specific Instructions:

Bottom Panel:

Google drive docs
500
width720
showLinktrue
urlhttps://docs.google.com/document/d/1zz9MHElhTHEEdvAh912-kDlM8BfbzVFHRpZbQYcKgZ8/edit#
height200

Side Panels:

SIDE PANEL(S)-CHASSIS INTEGRATION