Work in progress

What needs to be done

  • Find the angles the Nomura MPPT needs to be set at so that it can boost the voltage from the array to the necessary amount

    • The left array will have six nomuras. To ensure that the voltage is 160V each should be boosting to about 26.7V

    • The right array will have five nomuras. They need to be boosted to about 32

...

If the solar cells are available it would be beneficial to be able to connect a solar cell to the nomura to ensure that the angles that are used works. Once the voltage that the array actually provides can be confirmed, setting up test cases with these values would be extremely beneficial as they would give the most amount of information regarding whether the angels determined work.

Fixing the Potentiometers

  • Use hot glue like previously done

  • Use a different types of nuts (have to test which ones would work) to lock the position

  • Washers could work as well